Apr 15 2008

Laying the Sedum Roof

roof-crane-frame-used-to-unroll-sedum.jpgThe crane lifts the rolls up to the roof and the usual crane sign language is used to lower them in to place and unroll it up the slope.

roof-rubbing-an-overlap-edge-with-wood-block.jpgTo overlap each 1 metre wide roll an overlap edge has been provided that generally needs rubbing with a block of wood to remove odd bits of sedum and create a straight line for the next roll to butt up to.

Comments are closed.