The crane lifts the rolls up to the roof and the usual crane sign language is used to lower them in to place and unroll it up the slope.
To overlap each 1 metre wide roll an overlap edge has been provided that generally needs rubbing with a block of wood to remove odd bits of sedum and create a straight line for the next roll to butt up to.