Having given the siding a week to acclimatise to the heated house, we can now start to fit it. It is 2″ thick, and our skirting is about 4 inches tall, so we pack out the bottom (first) piece of siding with some 4 x 2 reduced to 3.5″ which also sets the siding so that it is at the correct hieght to the logs on the walls and therefore looks like it is part of the log wall.
The house has several 7″ square posts supporting the roof through the floors and one of these just falls in the wrong place for the siding, which cannot be slid into position because of the post protruding in th adjacent side wall close to the corner.
So we have to cut the siding lenghts slightly short and will have to fit a trim to cover this up later when all the siding has been fitted.
This particular stud wall has siding on both sides so we have to come up with a clever way around things to avoid showing any fixings on the log.
So we fix battens to the back of the siding, lift the siding in place and then screw through the battens to fix the siding to the studs. As each piece of siding is put in place, sound insulation is dropped in place to fill the gap as we go along.