Here is another use for the lovely sheepswool insulation we got. With a few left overs we can fill the settlement gap above this outside door before fitting the architrave around the inside. We started with about 2″ of settlement gap above door and window frames and in many places this has already reduced to about an inch. Hopefully there is not much more movement left in the logs after nearly 18 months since the build started.
May
19
2009