As the scaffold is taken down the down pipe for the gutter needs to be installed while we can stand on the lower level and the upper level scaffold has been removed. It takes about a full day for all the scaffold to be taken down. We bought this gutter system in Germany a few Christmases ago – like a lot of self builders we have been accumulating things that we saw that we liked before the building started, along with tearing out pages from magazines that had things we thought would suit the house.
May
27
2008