Prior to the logs arriving we sat down and decided where we would need wiring conduit for electrical, tv, phone etc services that would be set in the log walls. Then, as each log is stacked you have to drill with a long auger, checking with some conduit as you set each log that you are drilling bang on vertical. Where the conduit runs were going from floor to ceiling so going through 10 or more logs, the conduit was put in place after about 6 logs and left in place and logs lowered onto the conduit. It’s also very easy to forget to put a hole in, and once the next log is in place it’s too late! So bits of conduit were left in place sticking up to remind us.
Dec
13
2007